BC Hydro - Mica Power Plant

FSin
Posts: 2
Joined: Wed Dec 31, 1969 7:33 pm

BC Hydro - Mica Power Plant

Postby FSin » Fri Jan 20, 2012 10:51 am

Closes: 23 / 01/ 2012

Website: Check out the BC Fire Chiefs Association Website, under career opportunities

This RFP is issued by BC Hydro to obtain Proposals from parties wishing to provide the
following Work to BC Hydro:

BC Hydro is seeking to engage multiple contract fire fighters to support construction
underway at Mica Generating Station (MCA), located 135 km north of Revelstoke, British
Columbia.

Contract fire fighters will be required to meet the requirements listed in this RFP. These
individuals will work under Contract for up to one year, with an option to renew for up to
three additional years at one year terms, for a total of four years at the sole discretion
of BC Hydro. These contracts will include the delivery of emergency responder duties such
as; fire fighting, rescue, emergency medical and related services at BC Hydro Mica
Generating Station and townsite.

Proponents must be ProBoard and/or IFSAC certified to the NFPA 1001, Fire Fighter Level 2
with a minimum of four years experience in a composite Fire Department or ProBoard and/or
IFSAC certified to the NFPA 1081, Industrial Fire Fighting Level 3 with a minimum of 5
years experience on an Industrial Emergency Response Team.

Day to day responsibilities include but are not limited to, fire preplanning, fire
prevention, training, education and equipment maintenance. It is anticipated that Team
Members may be required to perform other duties on the construction site, and as such
trades experience is an asset. Potential Proponents wishing to respond to this RFP shall
follow Instructions and Terms for Submission of Proposals listed in the RFP. No late
submissions will be accepted.

Please note: there are two optional information sessions to be held in Vernon and Burnaby,
B.C. Please see Part 1 - Section 3.0 of the RFP document.

gatiproj
Posts: 1
Joined: Wed Dec 31, 1969 7:33 pm

Hydro Electric Power | Hydro Electric Power Plants | Hydro Power Plant

Postby gatiproj » Wed Nov 25, 2015 5:44 am

Gati Infrastructure have unfurled their plans in the Indian hydropower sector. Gati Infrastructure Group was conceived to develop power projects that have renewable and green energy as the focal point and which would contribute towards the economic growth and development of India. Currently, Gati Infratsructure has a portfolio of Hydro Electrical Power Projects, Solar Power Projects and Coal Projects with the hydro power projects being Chuzachen Project on Rangpo and Rongli Rivers in East Sikkim producing 110MW, Bhasmey Project on Rangpo River downstream of Chuzachen Project in East Sikkim producing 54 MW and Sada Mangder Project on Rangit and Relli Rivers in West Sikkim producing 71 MW.

India has vast potential for hydro-power development ensuring not only the abridgement of gap in demand and supply but also leading to surplus power in the country. Therefore, it is important for the benefit of the nation to harness hydro electricity potential for sustainable development of India.


Who is online

Users browsing this forum: No registered users and 6 guests